BW is needed on:

1) Ku band loopback capacity on GE-23 South Pacific Beam. 1MHz is required in January 2010 and a further 2.3MHz in April 2010. Contract term required is 1 year.

2) 10MHz is required on Apstar-2R Pol A for a 3 year contract period.